At 12 a.m. on September 29, the Guangzhou East Ring Intercity Railway (Panyu-Baiyun Airport North), the Pazhou-Lianhuashan Intercity Railway, and the northern extension of the Guangzhou-Huizhou Intercity Railway (Xiaojinkou-Huizhou North) officially began operations. Baiyun Airport East Station opened simultaneously with Terminal 3 of Baiyun Airport.

Also on September 29, Guangzhou Metro Line 13 Phase II (Tianhe Park-Yuzhu), Line 14 Phase II (Jiahewanggang-Lejia Road), and the Guangzhou East Railway Station section of Line 11 started operations with the first train. The operating mileage of the Guangzhou Metro network reaches 768.4 kilometers.

The Guangzhou East Ring Intercity Railway (Panyu-Baiyun Airport North) covers 57.8 km with 13 stations. The Pazhou-Lianhuashan Intercity Railway is 18.2 km long with 4 stations.
The Guangzhou-Huizhou Intercity Railway (Xiaojinkou-Huizhou North) is 6.4 km long with 2 stations.

Metro Line 13 Phase II (Yuzhu-Tianhe Park) spans 8.3 km with 4 stations. Metro Line 14 Phase II (Lejia Road–Jiahewanggang) runs 9 km with 7 stations.
Latest Metro and Intercity Railway Map
